DURAG GROUP, Hamburg

In a new building of the DURAG Group in Hamburg the interior cladding of the main staircase was realized with LUCEM translucent concrete panels. As a special feature integrated in the curtain wall cladding a display case shows the capsule with the document of the foundation act. 

Client: DURAG Group, Hamburg

Architect: redante haun architekten, Hamburg

Installation: Schendel International, Neukirchen-Vluyn

 

Year: 2015

Material: LUCEM LINE Anthrazit

Format: 150 cm x 60 cm

Thickness: 20 mm

Surface: 50 qm

Fixture: KEIL undercut anchors

Light: LED light panel